Computer Science ›› 2020, Vol. 47 ›› Issue (6A): 124-129.doi: 10.11896/JsJkx.190900123
• Artificial Intelligence • Previous Articles Next Articles
YAO Min
CLC Number:
[1] KADRI R L,BOCTOR F F.An efficient genetic algorithm to solve the resource-constrained proJect scheduling problem with transfer times:The single mode case.European Journal of Operational Research,2018,265(2):454-462. [2] REN Y F,LU Z Q,LIU X Y,et al.ProJect scheduling problem with hierarchical levels of skills.Journal of ZheJiang University (Engineering Science),2017,51(5):1000-1006. [3] NRON E.Lower bounds for the multi-skill proJect scheduling problem//Proceeding of the Eighth International Workshop on ProJect Management and Scheduling.2002:274-277. [4] BELLENGUEZ-MORINEAU O.Methods to solve multi-skill proJect scheduling problem.Springer-Verlag,2008. [5] LI H,WOMER K.Scheduling proJects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm.Journal of Scheduling,2009,12(3):281. [6] JIA Y,WANG Z M,ZHANG Y G.Heuristic algorithm for flexible resource-constrained proJect scheduling problem.Computer Integrated Manufacturing Systems,2015,21(7):1846-1855. [7] ZHANG M,LU Z Q.Improved algorithm for multi-skill resource constraint proJect scheduling problem.Computer Integrated Manufacturing Systems,2016,22(3):782-792. [8] XIE F,XU Z,YU J.Bi-obJective optimization for the proJectscheduling problem with variable resource availability.Systems Engineering-Theory & Practice,2016,36(3):674-683. [9] HEIMERL C,KOLISCH R.Scheduling and staffing multiple proJects with a multi-skilled workforce.OR spectrum,2010,32(2):343-368. [10] LIU Z Y,YUAN H T,ZHOU C,et al.Branch and bound based approach for preemptive proJect scheduling with time-window constraints on multi-skilled resources.Systems Engineering-Theory & Practice,2019,39(1):183-199. [11] MYSZKOWSKI P B,OLECH P,LASZCZYK M,et al.Hybrid differential evolution and greedy algorithm (DEGR) for solving multi-skill resource-constrained proJect scheduling problem.Applied Soft Computing,2018,62:1-14. [12] TRITSCHLER M,NABER A,KOLISCH R.A hybrid metaheuristic for resource-constrained proJect scheduling with flexible resource profiles.European Journal of Operational Research,2017,262(1):262-273. [13] ZHA H,ZHANG L.Fuzzy flexible resource constrained proJect scheduling based on genetic algorithm.Transactions of TianJin University,2014,20(6):469-474. [14] RANJBAR M,KIANFAR F.Resource constrained proJect scheduling problem with flexible work profiles:a genetic algorithm approach.Scientia Iranica.Transaction E,Industrial Engineering,2010,17(1):25. [15] XING L N,CHEN Y W,YANG K W.Multi-population interactive coevolutionary algorithm for flexible Job shop scheduling problems.Computational Optimization and Applications,2011,48(1):139-155. [16] COCHRAN J K,HORNG S M,FOWLER J W.A multi-population genetic algorithm to solve multi-obJective scheduling problems for parallel machines.Computers & Operations Research,2003,30(7):1087-1102. [17] JIAO Y L,ZHANG P,TIAN G D,et al.Slotting optimization of automated warehouse based on multi-population GA.Journal of Jilin University(Engineering and Technology Edition),2018,48(5):1398-1404. [18] LIU A J,YANG Y,XING Q S,et al.Multi-population genetic algorithm in multiobJective fuzzy and flexible Job Shop scheduling.Computer Integrated Manufacturing Systems,2011,17(9):1954-1961. [19] WANG D,GUI W X.A multi-population genetic algorithm based on cross accessibility evaluation.Journal of Guangxi University(Natural Science Edition),2015,40(6):1508-1516. [20] MAGHSOUDLOU H,AFSHAR-NADJAFI B,NIAKI S T A.A multi-obJective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained proJect scheduling problem.Computers & Chemical Engineering,2016,88:157-169. |
[1] | ZHOU Rong,YE Chun-ming,XIE Yang and CHEN Jun-lan. Research of Multi-objective and Multi-mode Project Scheduling Problem Based on Chaos Particle Swam Optimization [J]. Computer Science, 2013, 40(4): 259-262. |
[2] | . Flexible-resource Constrained Project Scheduling Research Based on Particle Swarm Optimization [J]. Computer Science, 2013, 40(2): 241-244. |
[3] | XUE Feng,QU Dai-ming,ZHU Guang-xi,LIU Li. Optimal Cooperative Spectrum Sensing Algorithm of the Resource Constrained Cognitive Radio Networks [J]. Computer Science, 2010, 37(9): 54-56. |
|