Computer Science ›› 2015, Vol. 42 ›› Issue (1): 28-32.doi: 10.11896/j.issn.1002-137X.2015.01.006
Previous Articles Next Articles
LIU Chun-yao and ZHANG Li-chen
[1] NSF Workshop on Cyber-Physical Systems.http://varma.ece.cmu.edu/cps/,Oct.2006 [2] COMPUTING,EMBEDDED.Cyber-physical systems.http://en.wikipedia.org/wiki/cyber-physical-system [3] Baheti,Radhakisan,Gill H.Cyber-physical systems[C]∥TheImpact of Control Technology.2011:161-166 [4] Rajkumar,Raj R,et al.Cyber-physical systems:the next computing revolution[C]∥Proceedings of the 47th Design Automation Conference.ACM,2010 [5] Lui Sha,et al.Cyber-physical systems:A new frontier." Ma-chine Learning in Cyber Trust[M].Springer US,2009:3-13 [6] Lee E A,Seshia S A.Introduction to Embedded Systems,A Cyber-Physical Systems Approach.http://LeeSeshia.org [7] Wang Xiao-feng.Event-triggering in cyber-physical systems[M].Diss.University of Notre Dame,2009 [8] Tan Ying,Goddard S,Perez L C.A Prototype Architecture forCyber-Physical Systems[J].ACM SIGBED Review,Special issues on RTSS forum on deeply embedded real-time computing,2008,5(1) [9] Lee E A.Cyber-physical systems-are computing foundations adequate[C]∥Position Paper for NSF Workshop on Cyber-Physical Systems:Research Motivation,Techniques and Roadmap.2006,2 [10] Lee E A.Cyber Physical Systems:Design Challenges[C]∥In-ternational Symposium on Object/Component/Service-Oriented Real-Time Distributed Computing (ISORC).May 2008 [11] Richard W,Parmer G.A software architecture for next-generation cyber-physical systems[C]∥Position Paper at the NSF Cyber-Physical Systems Workshop.2006 [12] Zhang F,Szwaykowska K,Wolf W,et al.Task Scheduling forcontrol oriented requirements for cyber-physical systems [C]∥Proc.IEEE Real-Time Systems Symposium.2008:47-56 [13] Zhang Fu-min,Shi Zhen-wu,Wolf W.A dynamic battery model for co-design in cyber-physical systems[C]∥29th IEEE International Conference on Distributed Computing Systems Workshops,2009.ICDCS Workshops’09.IEEE,2009:51-56 [14] Goswami D,Schneider R,Chakraborty S.Co-design of cyber-physical systems via controllers with flexible delay constraints[C]∥Proceedings of the 16th Asia and South Pacific Design Automation Conference (ASPDAC).2011:225-230 [15] Tang Q,Gupta S K S,Varsamopoulos G.A Unified Methodology for Scheduling in Distributed Cyber-Physical Systems[J].ACM Transactions on Embedded Computing Systems (TECS),2012,11(S2):57 [16] Li Qiao.Scheduling in Cyber-Physical Systems.http://www.cyphylab.ee.ucla.edu/Home/project/control-and-real-time-scheduling-co-design [17] Olivier B,Garcia J-M.Analytical solution of finite capacity M/D/1 queues[J].Journal of Applied Probability,2000,37(4):1092-1098 [18] 陆传赉.排队论(第二版)[M].北京:邮电大学出版社 |
No related articles found! |
|