Computer Science ›› 2016, Vol. 43 ›› Issue (8): 240-243.doi: 10.11896/j.issn.1002-137X.2016.08.048
Previous Articles Next Articles
ZHANG Li-hong and YU Shi-ming
[1] Wang Ling,Wu Hao,Tang Fang.A Hybrid Quantum-Inspired Genetic Algorithm for Flow Shop Scheduling[J].Lecture Notes in Computer Science,2005,3654:636-644 [2] Wang L,Zhong D Z.An effective hybrid heuristic for flow shop scheduling[J].International Journal of Advanced Manufactu-ring Technology,2003,21:38-44 [3] Johnson S.Optimal two-and-three stage production scheduleswith setup time include[J].Naval Research Logistics Quarterly,1954,1:61-68 [4] Gupta J N.Two-stage hybrid Flow shop scheduling problem[J].Operational Research Society,1988,39(4):359-364 [5] Dannenbring D G.An evaluation of flow shop sequencing heuristics[J].Management Science,1977,23(11):1174-1182 [6] Nawaz M,Enscore J E,Ham I.A heuristic algorithm for the m-machine,n-job flow-shop sequencing problem[J].Omega,1983,11(1):91-95 [7] Gupta J N D,Chen C L,Yap L Y,et al.Designing a tabu search algorithm to minimize total flow time in a flow shop[J].Arabian Journal for Science and Engineering,2000,25(1C):79-94 [8] Rajendran C,Zieglerb H.Amt colony algorithms for permutation flow-shop scheduling problem to minimize makespan/total flowtime of jobs[J].European Journal of Operational Research,2004,155(2):426-438 [9] Krishnanand K N,Ghose D.Detection of multiple source locations using a glowworm metaphor with applications to collective robotics[C]∥Proc of IEEE Swarm Intelligence Symposium.Piscataway:IEEE Press,2005:84-91 [10] Huang Zheng-xin,Zhou Yong-quan.Self-adaptive step glowwormswarm optimization algorithm for optimizing multimodal functions[J].Computer Science,2011,32(10):220-224(in Chinese) 黄正新,周永权.自适应步长萤火虫群多模态函数优化算法[J].计算机科学,2011,38(7):220-224 [11] Liu Jia-kun,Zhou Yong-quan.Glowworm swarm optimizationalgorithm based on max-min luciferin[J].Application Research of Computers,2011,28(10):3662-3664(in Chinese) 刘佳昆,周永权.一种最大最小萤光素值人工萤火虫算法[J].计算机应用研究,2011,28(10):3662-3664 [12] Wu Wei-min,Kang Shao-jiang,Lin Zhi-yi,et al.Multimodalfunction optimisation based on improved glowworm swarm optimisation[J].Computer Applications and Software,2014(1):283-285,2(in Chinese) 吴伟民,亢少将,林志毅,等.基于改进萤火虫算法的多模函数优化[J].计算机应用与软件,2014,(1):283-285,302 [13] Davis L.Job shop scheduling with genetic algorithms[C]∥International Conference on Genetic Algorithms and Their Applications.Mahwah,NJ,Lawrence Eribaum Associate,1985:136-140 [14] Ge Hong-wei.The research of some optimization problemsbased on computational intelligence[D].Jilin:Jilin University,2006(in Chinese) 葛宏伟.基于计算智能的若干优化问题研究[D].吉林:吉林大学,2006 [15] Carlier J.Scheduling with disjunctive constraints[J].Operations Research,1978,12(4):333-350 [16] Taillard E.Scheduling instances.(2015-06-03).http://mistic.heg-vd.ch/taillard/problems.dir/ordonnancement.dr/ ordonnancement.html [17] Wang Shu-ting.Studies on permutation flow shop scheduling using genetic algorithm variable neighborhood search[D].Changsha:Huazhong University of Science and Technology,2013(in Chinese) 王书婷.基于遗传变邻域算法的置换流水车间调度问题研究[D].长沙:华中科技大学,2013 |
No related articles found! |
|