Computer Science ›› 2025, Vol. 52 ›› Issue (11A): 250900008-10.doi: 10.11896/jsjkx.250900008
• Artificial Intelligence • Previous Articles Next Articles
LI Haifeng1, CHEN Qing1,2, HUANG Yuehua1,3, CHEN Xi1,3, WEN Bin1,2, WU Xichun4
CLC Number:
| [1]CHEN X,HAN Y F,YAN Y F,et al.A unified algorithm for object tracking and segmentation and its application on intelligent video surveillance for transformer substation[J].Procee-dings of the CSEE,2020,40(23):7578-7587. [2]JIANG Q,LIU Y D,YAN Y J,et al.Substation inspection robot PTZ camera alignment method for high zoom scenes[J].Proceedings of the CSEE,2024,44(8):3337-3347. [3]DONG X Y,JI K,ZHU J,et al.A retrofitted ant colony algorithm for inspection robot path planning in UHV substations[J].Power System Protection and Control,2021,49(18):154-160. [4]QI B,JI M,ZHENG Y P,et al.Application status and development prospect of power internet of things technology in condition assessment of power transmission and transformation equipment[J].High Voltage Engineering,2022,48(8):3012-3031. [5]PENG M Z,XU Y,HU Y B,et al.Intelligent inspection techno-logy for secondary equipment in substations based on artificial intelligence technology [J].High Voltage Engineering,2023,49(S1):90-96. [6]TONG J,QI Z H,PU T J,et al.Edge intelligence to power internet of things:concept,architecture,technology and application[J].Proceedings of the CSEE,2024,44(14):5473-5496. [7]ZHANG C X,LU Z H,LIU X C.Joint inspection technology and its application in a smart substation [J].Power System Protection and Control,2021,49(9):158-164. [8]ZHANG S J,DU H T,HOU T T.An improved NSGA-Ⅱ algorithm for solving multi-objective dual resource constrained flexible job shop scheduling problem[J].Mechanical Science and Technology for Aerospace Engineering,2023,49(S1):90-96. [9]PEI H L.Joint scheduling method of machine and handling robot in flexible manufacturing workshop[J].Modern Manufacturing Engineering,2023(3):15-21. [10]SHI W,ZHOU S,NIU Z,et al.Joint device scheduling and resource allocation for latency constrained wireless federated learning[J].IEEE Transactions on Wireless Communications,2020,20(1):453-467. [11]ZHOU K,TAN C,WU Y,et al.Research on low-carbon flexible job shop scheduling problem based on improved Grey Wolf Algorithm[J].The Journal of Supercomputing,2024,80(9):12123-12153. [12]HU R Q,CHENG H,ZHANG Z N.Solving job shop scheduling problem with flexible process sequence based on expression tree model[J].Computer Integrated Manufacturing Systems,2024,30(6):2036-2043. [13]LU J S,JIN J H,ZHAO W B,et al.Lot streaming hybrid assembly flow shop scheduling on migratory bird algorithm[J].Journal of Zhejiang University(Engineering Science),2022,56(11):2135-2144. [14]WANG S H,LI Y,LI X Y.An improved whale swarm algorithm for flexible job-shop scheduling problem[J].Journal of Chongqing University,2020,43(1):1-11. [15]YANG G,YU L.A chimp algorithm based on the foragingstrategy of manta rays and its application[J].Plos One,2024,19(3):e0298230. [16]ZHANG S J,YANG W Q,GU X S.An improved multi-swarm migrating birds optimization algorithm for hybrid flow shop scheduling[J].Journal of Shanghai Jiao Tong University,2023,57(10):1378-1388. [17]LEI D M,LIU J Y.Reentrant hybrid flow shop scheduling based on cooperated shuffled frog-leaping algorithm[J].Huazhong Univ.of Sci.& Tech.(Natural Science Edition),2023,51(5):125-130. [18]WU R R,LI D J,QIN J,et al.System design of an indoor inspection robot driven by a flexible cable in a substation [J].Power System Protection and Control,2021,49(10):89-97. [19]HALL N G,SRISKANDARAJAH C.A survey of machinescheduling problems with blocking and no-wait in process[J].Operations Research,1996,44(3):510-525. [20]WANG J,WANG W,HU X,et al.Black-winged kite algorithm:a nature-inspired meta-heuristic for solving benchmark functions and engineering problems[J].Artificial Intelligence Review,2024,57(4):1-53. [21]ZHANG Z,WANG X,YUE Y.Heuristic optimization algorithm of black-winged kite fused with osprey and its engineering application[J].Biomimetics,2024,9(10):595. [22]BA Z Y,YUAN Y P,PEI G Q,et al.Hybrid evolutionary algorithm with multi-operation precise joint movement neighborhood structure for job shop scheduling problem[J].Computer Integrated Manufacturing Systems,2024,30(2):537-552. [23]AMARO D,ROSENKRANZ M,FITZPATRICK N,et al.Acase study of variational quantum algorithms for a job shop scheduling problem[J].EPJ Quantum Technology,2022,9(1):5. [24]MENG L L,ZHANG B,REN Y P,et al.Hybrid shuffled frog-leaping algorithm for distributed flexible job shop scheduling[J].Journal of Mechanical Engineering,2021,57(17):263-272. [25]NAWAZ M,ENSCORE J E E,HAM I.A heuristic algorithm for the m-machine,n-job flow-shop sequencing problem[J].Omega,1983,11(1):91-95. [26]WANG J,LIAO J,ZHOU Y,et al.Differential evolution en-hanced with multiobjective sorting-based mutation operators[J].IEEE Transactions on Cybernetics,2014,44(12):2792-2805. [27]LI D H,XIONG W Q,WANG Z D.Improving seagull optimization algorithm combined multiple strategies and its application[J].Application Research of Computers,2023,40(5):1360-1367,1374. [28]DAUZÈRE-PÉRÈS S,DING J,SHEN L,et al.The flexible job shop scheduling problem:A review[J].European Journal of Operational Research,2024,314(2):409-432. [29]XIONG F L,LI L L.Just-in-time distributed precast scheduling with considering production and transportation costs[J].Computer Integrated Manufacturing Systems,2024,30(12):4386-4405. |
| [1] | WU Liuchen, ZHANG Hui, LIU Jiaxuan, ZHAO Chenyang. Defect Detection of Transmission Line Bolt Based on Region Attention Mechanism andMulti-scale Feature Fusion [J]. Computer Science, 2023, 50(6A): 220200096-7. |
| [2] | LI Fa-guang, YILIHAMU·Yaermaimaiti. Real-time Detection Model of Insulator Defect Based on Improved CenterNet [J]. Computer Science, 2022, 49(5): 84-91. |
| [3] | ZHAO Zhen-bing, CUI Ya-ping, QI Yin-cheng, DU Li-qun, ZHANG Ke, ZHAI Yong-jie. Detection Method of Insulator in Aerial Inspection Image Based on Modified R-FCN [J]. Computer Science, 2019, 46(3): 159-163. |
|
||