Computer Science ›› 2021, Vol. 48 ›› Issue (11A): 22-29.doi: 10.11896/jsjkx.201200167
• Intelligent Computing • Previous Articles Next Articles
GAO Xi, SUN Wei-wei
CLC Number:
[1]ZHANG S,LV M Q,DAI J H,et al.Research on Quay Crane Scheduling Optimization Based on the Uncertainty of Operation Time[J].Industrial Engineering and Management,2020,25(5):54-62. [2]Statistics of Container Terminal Throughput for Main Ports in China (Jul.,2020)[J].Containerization,2020,31(8):34-35. [3]ZHAO C.The Way to Improve the Port[J].Industry City,2020(10):54-55. [4]LU S X,LV C H,QING T.An Algorithm Based on Make Span Lower Bound for Quay Crane Schedule Problem in Container Terminals[J].Operations Research Transactions,2020,24(3):67-76. [5]LIU J,WAN Y W,WANG L.Quay crane Scheduling at Container Terminals to Minimize the Maximum Relative Tardiness of Vessel Departures[J].Naval Research Logs,2006,53(1):60-74. [6]MIAO W L.Quay Crane Scheduling with Non-Interference Constraints in Port Container Terminals[J]. Transportation Research Part E Logistics & Transportation Review,2008,44(1):124-135. [7]KAVESHGAR N,NUYNH N,RAHIMIAN S K.An Efficient Genetic Algorithm for Solving the Quay Crane Scheduling Problem[J].Expert Systems With Applications,2012,39(18):13108-13117. [8]CHUNG S H,FELIX T,CHAN S.A Workload Balancing Genetic Algorithm for the Quay Crane Scheduling Problem[J].International Journal of Production Research,2013,51(16):4820-4834. [9] SU N Y,ZHANG M J,JOHNSTON M,et al.Hybrid Evolutionary Computation Methods for Quay Crane Scheduling Problems[J].Computers and Operations Research,2013,40(8):2083-2093. [10]LEE D H,WANG H Q,MIAO L X.Quay Crane Schedulingwith Handling Priority in Port Container Terminals.Engineering Optimization,2008,40(2):179-189. [11]KIM K H,PARK Y M.A Crane Scheduling Method for Port Container Terminals [J].European Journal of Operational Research,2004,156(3):752-768. [12]ZHU Y,LIM A.Crane Scheduling with Non-Crossing Con-straint.Journal of the Operational Research Society,2006,57(12):1464-1471. [13]PETERKOFSKY R I,DAGANZO C F.A Branch and Bound Solution Method for the Crane Scheduling Problem[J]. Transportation Research Part B Methodological,1990,24(3):159-172. [14]MOCCIA L,CORDEAU J F,GAUDIOSO M,et al.A Branch-and-Cut Algorithm for the Quay Crane Scheduling Problem in a Container Terminal[J].Naval Research Logistics,2006,53(1):45-59. [15]BIERWIRTH C,MEISEL F.A Fast Heuristic for Quay Crane Scheduling with Interference Constraints[J].Journal of Scheduling,2009,12(4):345-360. [16]SONG Y T,WANG N,WU N.Optimization of Berth and Quay Crane Collaborative Scheduling Considering Both the Cost and Time Guarantee Rate[J].Operations Research and Management Science,2020,29(4):130-137. [17]LE M L,ZHAO Y Y,LIU X L.Shore-Mounted Gantry Crane Scheduling for Single Vessel Under Time Window-Using Mathematical Programming and Rule Heuristic Algorithm[J].Computer Engineering and Applications,2014,50(9):242-248. |
[1] | YU Xin, LIN Zhi-liang. Novel Neural Network for Dealing with a Kind of Non-smooth Pseudoconvex Optimization Problems [J]. Computer Science, 2022, 49(5): 227-234. |
[2] | HUANG Guang-qiu, LU Qiu-qin. Vertical Structure Community System Optimization Algorithm [J]. Computer Science, 2020, 47(4): 194-203. |
[3] | YANG Ting, LUO Fei, DING Wei-chao, LU Hai-feng. Bin Packing Algorithm Based on Adaptive Optimization of Slack [J]. Computer Science, 2020, 47(4): 211-216. |
[4] | CAO Fang and ZHU Yong-kang. 3D Reconstruction Based on SFS Method and Accuracy Analysis [J]. Computer Science, 2017, 44(Z6): 244-247. |
[5] | MEI Hai-tao, HUA Ji-xue and WANG Yi. Improved Intuitionistic Fuzzy Genetic Algorithm for Nonlinear Programming Problems [J]. Computer Science, 2016, 43(9): 250-254. |
[6] | MAO Li, ZHOU Chang-xi and WU Bin. Artificial Bee Colony Algorithm Based on Strategy of Segmental-search with Current Optimal Solution [J]. Computer Science, 2015, 42(12): 263-267. |
[7] | CAO Jian-wei,CHEN Qing-kui and ZHUANG Song-lin. UPSO (Uniform Particle Swarm Optimization):An Algorithm of Dynamic Overlay Optimization for WSN [J]. Computer Science, 2014, 41(Z6): 255-257. |
[8] | WEN Chuan-jun,WANG Qing-miao and ZHAN Yong-zhao. Equalization Fuzzy C-means Clustering Algorithm [J]. Computer Science, 2014, 41(8): 250-253. |
[9] | HAN Li-xia. Novel Genetic Algorithm for Multi-objective Optimization Problem [J]. Computer Science, 2013, 40(Z6): 64-66. |
[10] | . [J]. Computer Science, 2009, 36(4): 235-238. |
[11] | ZHENG Jin-hua, LUO Biao, LI Jing ,WEN Shi-hua ,LI Wang-yi (Institute of Information Engineering,Xiangtan University, Xiangtan 411105, China). [J]. Computer Science, 2009, 36(2): 30-34. |
|