Computer Science ›› 2022, Vol. 49 ›› Issue (6A): 753-758.doi: 10.11896/jsjkx.210700225
• Interdiscipline & Application • Previous Articles Next Articles
QUE Hua-kun1, FENG Xiao-feng1, GUO Wen-chong1, LI Jian1, ZENG Wei-liang2, FAN Jing-min2
CLC Number:
[1] ZHU Z H,GAO Z Y,ZHENG J F,et al.Charging station location problem of plug-in electric vehicles[J].Journal of Transport Geography,2016,52:11-22. [2] PAGANY R,CAMARGO L R,DORNER W.A review of spatial localization methodologies for the electric vehicle charging infrastructure[J].International Journal of Sustainable Transportation,2019,13(6/7/8/9/10):433-449. [3] XIANG Y,LIU J,LI R,et al.Economic planning of electric vehicle charging stations considering traffic constraints and load profile templates[J].Applied Energy,2016,178:647-659. [4] YANG Y,GAO P,ZHAO C Z.Electric Vehicle TemporaryCharging Station Location Model and Constant Volume Model in the City[J].Journal of Chongqing Normal University(Natural Science),2020,37(6):1-6. [5] LIU Z P,WEN Q F,XUE F S.Optimal location and constant volume of electric vehicle charging stations[J].Automation of Electric Power Systems,2012,36(3):54-59. [6] CHENG Y,WANG L.A location model for capacitated alternative-fuel stations with uncertain traffic flows[J].Computers & Industrial Engineering,2020,145(1):12-19. [7] WANG N,WANG C,NIU Y,et al.A two-stage charging facilities planning method for electric vehicle sharing systems[J].IEEE Transactions on Industry Applications,2020,57(1):149-157. [8] RIEMANN R,WANG D Z W,BUSCH F.Optimal location of wireless charging facilities for electric vehicles:flow-capturing location model with stochastic user equilibrium[J].Transportation Research Part C:Emerging Technologies,2015,58:1-12. [9] JOCHEM P,BRENDEL C,REUTER-OPPERMANN M,et al.Optimizing the allocation of fast charging infrastructure along the German autobahn[J].Journal of Business Economics,2016,86(5):513-535. [10] LIU B,LIU Y K.Expected value of fuzzy variable and fuzzy expected value models[J].IEEE transactions on Fuzzy Systems,2002,10(4):445-450. [11] TORABI S A,HASSINI E.An interactive possibilistic programming approach for multiple objective supply chain master planning[J].Fuzzy Sets and Systems,2008,159(2):193-214. [12] RAHIMI Y,TAVAKKOLI-MOGHADDAM R,MOHAMMA-DI M,et al.Multi-objective hub network design under uncertainty considering congestion:An M/M/c/K queue system[J].Applied Mathematical Modelling,2016,40(5/6):4179-4198. |
[1] | ZHANG Jie, TANG Qiang, LIU Shuo-han, CAO Yue, ZHAO Wei, LIU Tao, XIE Shi-ming. Priority Based EV Charging Management Under Service Reservation in Smart Grid [J]. Computer Science, 2022, 49(6): 55-65. |
[2] | LI Bao-sheng, QIN Chuan-dong. Study on Electric Vehicle Price Prediction Based on PSO-SVM Multi-classification Method [J]. Computer Science, 2020, 47(11A): 421-424. |
[3] | ZHOU Xin-yue, QIAN Li-ping, HUANG Yu-pin, WU Yuan. Optimization Method of Electric Vehicles Charging Scheduling Based on Ant Colony [J]. Computer Science, 2020, 47(11): 280-285. |
[4] | MA Wen-kai, LI Gui, LI Zheng-yu, HAN Zi-yang, CAO Ke-yan. Top-N Personalized Recommendation Algorithm Based on Tag [J]. Computer Science, 2019, 46(11A): 224-229. |
[5] | SHAO Wei-hui, XU Wei-sheng, XU Zhi-yu, WANG Ning, NONG Jing. Research of V2G Strategies for EV Parking Lot Based on Improved PSO [J]. Computer Science, 2018, 45(11A): 92-96. |
[6] | CHEN De-quan ZHANG Yong-gang XIN Ying LIU Wen-zhuang. Singleton Sub-problem Arc Consistency Based on Order [J]. Computer Science, 2015, 42(7): 28-31. |
[7] | TENG Shao-hua, ZHANG Hong, LIU Dong-ning, ZHU Hai-bin, ZHANG Wei and LIANG Lu. Constrainted E-CARGO Model Applying in CSP Problem [J]. Computer Science, 2015, 42(2): 241-246. |
[8] | ZHAO Fa-xin and JIN Yi-fu. Study on Fuzzy Query of Heterogeneous Bipolarity Information [J]. Computer Science, 2013, 40(7): 153-156. |
[9] | WANG Teng-fei,XU Zhou-bo and GU Tian-long. Symbolic ADD Algorithms for Arc Consistency and Application in Constraint Satisfaction Problem Solving [J]. Computer Science, 2013, 40(12): 243-247. |
[10] | . Calculation Model of Satisfaction Degree Based on Intuitionistic Fuzzy [J]. Computer Science, 2013, 40(1): 266-268. |
[11] | . Expressive Temporal Planning Algorithm under Dynamic Constraint Satisfaction Framework [J]. Computer Science, 2012, 39(6): 226-230. |
[12] | XU Zhou-bo,GU Tian-long,CHANG Liang,LI Feng-ying. OBDD-based Bucket Elimination Algorithm for Constraint Satisfaction Problem [J]. Computer Science, 2011, 38(7): 200-202. |
[13] | LI Wei,ZHANG Zi-li,WU Hua-jun. DCSP-based Resource Allocation Approach for Emergency Rescue in Coal Mine [J]. Computer Science, 2011, 38(5): 244-248. |
[14] | LI Zhan-shan,HAN Wen-cheng,GUO Ting. Retrospect and Prospect of Decomposition Technology [J]. Computer Science, 2011, 38(10): 29-33. |
[15] | YUAN Ji-jun SHAN Mi-yuan WANG Ke-xi (Management School, Hunan Universit y, Changsha 410082, China). [J]. Computer Science, 2008, 35(5): 158-162. |
|